Step-by-Step: What Happens During a CNG Cylinder Hydrostatic Test?
The 5-Stage Hydro Testing Procedure
Hydrostatic stretch testing ensures that the structural integrity of your high-pressure CNG cylinder remains resilient under normal filling and operating conditions.
Stage 1: Degassing & Residual Gas Evacuation
Before removing the cylinder valve, all remaining natural gas is safely vented and purged with inert nitrogen in a controlled explosion-proof area.
Stage 2: Internal Inspection & Endoscopy
The cylinder valve is unscrewed, and an optical inspection tool is inserted into the cylinder neck to inspect the inner wall surface for rust pitting, contamination, or crack propagation.
Stage 3: Water Jacket Test at 300 Bar
The cylinder is enclosed inside a sealed water jacket chamber, completely filled with de-aerated water, and pressurized using hydraulic pumps to 300 bar.
- The water displaced by cylinder expansion is precisely measured in a calibrated burette.
- When pressure is released, the residual permanent stretch is calculated.
Stage 4: Internal Baking & Complete Dehydration
Post-testing, hot dry air is circulated through the inverted cylinder to vaporize every droplet of residual moisture, preventing internal corrosion.
Stage 5: Valve Re-assembly & Leak Tightness Test
The valve threads are sealed using certified compound and torqued to specified manufacturer limits, followed by pneumatic nitrogen leak checks at 200 bar.
Specialists in Gas Cylinders Rules 2016, 300 Bar water jacket testing, and MoRTH compliance standards.
Due for CNG Cylinder Hydro Testing?
Book your slot online to ensure safety compliance and prevent refueling refusal.
Book Testing Appointment